Resources Statement (JORC 2012) based on 1g/tAu Cutoff

CHALLENGER deposit

Tonnes
(t)

Au
(g/t)

Au
(oz)

Measured

60%

357,000

4.17

47,900

Indicated

23%

163,000

3.50

18,300

Inferred

17%

144,000

3.07

14,100

Total

100%

663,000

3.77

80,300

CURRAJONG deposit

Tonnes
(t)

Au
(g/t)

Au
(oz)

Measured

-

-

-

-

Indicated

22%

126,000

2.57

10,400

Inferred

78%

407,000

2.63

34,400

Total

100%

533,000

2.61

44,800

DONKEY HILL deposit

Tonnes
(t)

Au
(g/t)

Au
(oz)

Measured

-

-

-

-

Indicated

-

-

-

-

Inferred

100%

103,000

5.03

16,600

Total

100%

103,000

5.03

16,600

CALEDONIAN deposit

Tonnes
(t)

Au
(g/t)

Au
(oz)

Measured

-

-

-

-

Indicated

-

-

-

-

Inferred

100%

157,000

5.94

30,000

Total

100%

157,000

5.94

30,000

TOTAL ADELONG GOLD PROJECT RESOURCES*

Tonnes
(t)

Au
(g/t)

Au
(oz)

Measured

25%

357,000

4.17

49,700

Indicated

20%

289,000

3.09

29,200

Inferred

55%

811,000

3.65

95,400

Total

100%

1,457,000

3.67

171,700

Competent Person Statement

Information on this page is a JORC (2012) Resource Estimation published by Robin Rankin who is the Competent Person and Member of the AusIMM in respect of those Resource Estimates.

Mr Peter Mitchell has prepared the JORC (2012) Resource Estimate based on the report prepared by Robin Rankin and his own experience with the Exploration Results and geological data for this Project. Mr Peter Mitchell is a Member of the Australasian Institute of Mining and Metallurgy, the Institute of Materials, Minerals and Mining and the Canadian Institute of Mining, Metallurgy and Petroleum. He is Managing Director and paid by 3D Resources Ltd. Peter Mitchell has sufficient experience that is relevant to the style of mineralisation and types of deposits under consideration and to the activity being undertaken to qualify as a Competent Person (CP) as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr Peter Mitchell believes that these Resource Estimates fairly represent the resources the subject of this Report.

The JORC (2012) Resource Estimates were prepared Robin Rankin. Robin Rankin is a Competent Person who is a Member (#110551) of the Australasian Institute of Mining and Metallurgy (MAusIMM) and accredited since 2000 as a Chartered Professional (CP) by the AusIMM in the Geology discipline. Robin Rankin provided this information to his Client 3D Resources Limited as paid consulting work in his capacity as Principal Consulting Geologist and operator of independent geological consultancy GeoRes. He and GeoRes are professionally and financially independent in the general sense and specifically of their Client and of the Client’s project. This consulting was provided on a paid basis, governed by a (in this case an on-going engagement) scope of work and a fee and expenses schedule, and the results or conclusions reported were not contingent on payments. Robin Rankin has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person (CP) as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Robin Rankin consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.