Historically the Adelong goldfield has produced around 800k ozs of gold. Many of the hard rock mines recorded very high grades averaging in excess of one ounce of gold per ton of ore.

Development Stage

Challenger Gold Project

Currajong Gold Project

  • Near term development option;
  • Project Resource of 89k ozs @ 2.71g/t1;
  • The high-grade veins continue to depth and will require access via a decline;
  • Resource that can potentially be accessed via open cut mining.
  • Large scale Open Cut potential;
  • Project Resource of 38k ozs @ 3.48g/t1;
  • Pockets of very high-grade ores were mined;
  • Larger lower grade mineralisation makes this an attractive target for open cut mining.

Exploration Potential

Donkey Hill

Gibraltar

Sawpit

  • Five parallel vein systems identified with 3 showing potential;
  • Drilling to be undertaken.
  • Old mine plans exist and digitisation of that data should aid geological interpretation and future exploration.
  • Specific reports on the Sawpit area record the presence of lodes from 1 to 6 m wide assaying up to 60 g/t.

Map showing exploration and mining licences with estimated historical production.